Commenting open: June 16, 2026 08:00AM CT - July 15, 2026 04:30PM CT.
Crissy Lake Dam Modifications EAW
The Pomme de Terre River Association is proposing a multi-component project to restore the hydrology and natural habitats of the Pomme de Terre River through Crissy Lake in the City of Morris, Minnesota. The project components include removal of the Crissy Lake Dam, installation of two rock arch rapids to replace the existing structure, and channel restoration extending from the existing dam to the upstream end of Crissy Lake.
Contact Information
*Indicates Required Fields
Thank you for subscribing to the Crissy Lake Dam Modifications EAW mailing list.
The Pomme de Terre River Association is proposing a multi-component project to restore the hydrology and natural habitats of the Pomme de Terre River through Crissy Lake in the City of Morris, Minnesota. The project components include removal of the Crissy Lake Dam, installation of two rock arch rapids to replace the existing structure, and channel restoration extending from the existing dam to the upstream end of Crissy Lake.
Contact Information
*Indicates Required Fields